This facility is a new 34,000-SF, two-story office building containing the Emergency Operations Center and Customer Technology Center for Charleston Water System (CWS). The building houses all essential departments directly adjacent to the utility company's Hanahan Water Treatment Plant, offering a centralized hub for CWS services.
LocationHanahan, South Carolina
ServicesMEP Building Engineering
MarketCivic
Highlights
One unique element of this project involves a display for a 100-year-old wooden pipe held together with metal bands found on the property. The project team took great care to preserve this piece of the city's history, as the pipe is theorized to be a result of the material shortages that left cast iron piping in short supply during World War I.
Related Media
School of Nursing
Randolph Macon College
AIA NC Center for Architecture and Design (LEED Platinum)
North Carolina Chapter of the American Institute of Architects
August 11, 2023
RMF’s Director of Sustainability, Martha Larson, is Featured in the Third Quarter 2023 issue of District Energy Magazine
Back to Projects