Moretz Stadium at Lenoir Rhyne University recently completed a multi-phased 15,000 SF renovation of the existing football stadium. Phase A covered concerns with the west side stadium seating and president box renovation. Phase B covered the East and South side seating, restrooms, and locker rooms. Phase C covered the entry ways and field lighting. RMF provided full MEP engineering services for this project.
Size15,000 SF
LocationHickory, North Carolina
ServicesMEP Building Engineering
MarketHigher Education